RTI for TSSPDCL / TSNPDCL — Electricity Bill, Connection and Meter Complaints in Telangana

File RTI with TSSPDCL or TSNPDCL to access electricity billing records, new connection status, meter testing results, transformer repair logs, and agricultural pump connection details in Telangana. Use this guide to identify the correct DISCOM, draft a precise application, and navigate the appeal process up to the Telangana State Information Commission.

Updated 2 Jun 2026
Quick Facts
MinistryEnergy Department, Government of Telangana
Address RTI ToState Public Information Officer (SPIO), Divisional Engineer / Assistant Divisional Engineer, TSSPDCL / TSNPDCL, concerned Division; or SPIO, Superintending Engineer, concerned Circle; or SPIO, Managing Director, TSSPDCL, Mint Compound, Hyderabad – 500 063 / TSNPDCL, Vidyut Bhavan, Warangal
Application Fee₹10 under RTI (Regulation of Fee and Cost) Rules, 2005. Free for BPL cardholders.
Response Time30 days from receipt (Section 7(1), RTI Act 2005). 48 hours if the matter involves life or liberty.
All information on this page is based on the Right to Information Act, 2005 (Act No. 22 of 2005) and the RTI (Regulation of Fee and Cost) Rules, 2005. First Appeal: Section 19(1). Second Appeal to CIC/SIC: Section 19(3).

The Telangana State Government restructured electricity distribution across the state by creating two separate Distribution Companies (DISCOMs) — TSSPDCL (Telangana State Southern Power Distribution Company Limited) for southern Telangana and TSNPDCL (Telangana State Northern Power Distribution Company Limited) for northern Telangana. Both are wholly owned by the Government of Telangana through the Telangana Power Generation Corporation Limited (TSGENCO) holding structure and are licensed by the Telangana State Electricity Regulatory Commission (TSERC). Together, they serve tens of millions of consumers across residential, commercial, industrial, and agricultural categories.

Electricity consumers in Telangana regularly face problems that require documented official records: sudden spikes in electricity bills without any explanation, new connection applications that remain unprocessed for months, faulty meters that are not replaced despite complaints, transformer overloads leading to chronic power cuts, and agricultural pump connections delayed year after year. Because TSSPDCL and TSNPDCL are public authorities under Section 2(h) of the Right to Information Act, 2005 — being substantially financed and controlled by the State Government — every citizen has a statutory right to access the records and information these companies hold. The RTI Act is one of the most effective tools available to Telangana electricity consumers for obtaining precise, certified answers.

TSSPDCL vs TSNPDCL: Which DISCOM Covers Your Area?

Before filing an RTI application, it is essential to identify which DISCOM is responsible for your locality, because each has a separate administrative structure, SPIO, and appeal hierarchy.

TSSPDCL (Southern) covers the following districts:

  • Hyderabad (all areas within the Greater Hyderabad Municipal Corporation and beyond)
  • Rangareddy (including areas such as LB Nagar, Shamshabad, Rajendranagar, Chevella, Vikarabad)
  • Mahbubnagar (Wanaparthy, Gadwal, Nagarkurnool and surrounding mandals)
  • Nalgonda (Bhongir, Miryalaguda, Suryapet, Devarakonda)
  • Medak (Siddipet, Sangareddy, Gajwel, Toopran)

TSSPDCL's corporate headquarters is at Mint Compound, Hyderabad – 500 063. Its consumer helpline is 1912.

TSNPDCL (Northern) covers the following districts:

  • Warangal (Hanamkonda, Kazipet, Jangaon and surrounding areas)
  • Karimnagar (Peddapalli, Jagtial, Rajanna Sircilla, Mancherial)
  • Nizamabad (Kamareddy, Armoor, Bodhan)
  • Adilabad (Nirmal, Mancherial, Kumuram Bheem Asifabad, Mancherial)

TSNPDCL's corporate headquarters is at Vidyut Bhavan, Warangal. Its consumer helpline is 1800-599-9911 (toll-free).

If you are unsure which DISCOM covers your locality, check your electricity bill — the name of the issuing company, the section office address, and the division details are printed on every bill. The DISCOM whose name appears on your bill is the authority to which you should address your RTI application.

What RTI Can Help You Get

The RTI Act, 2005, entitles any citizen to inspect or obtain certified copies of records held by a public authority. For TSSPDCL and TSNPDCL, the following categories of records are routinely sought by consumers and are disclosable under the Act.

Meter Reading History and Billing Records

Both DISCOMs record meter readings for every consumer at each billing cycle. If your bill appears inflated or incorrect, RTI can surface:

  • The actual opening and closing meter readings recorded by the meter reader for each billing cycle in the period you specify
  • Whether estimated or average billing was applied in any cycle in lieu of an actual reading, the reason for the estimation, and the billing cycles affected
  • The tariff category and rate per unit applied in each cycle, all fixed charges, electricity duty, fuel surcharge adjustment (FSA), and any arrears or adjustments bundled into the bills
  • Any corrections made to your account during the specified period and the basis for each correction

This documented record is the foundation for a formal billing dispute before the DISCOM's Consumer Grievances Redressal Forum (CGRF).

New Service Connection Status

TSERC's Supply Code and the DISCOMs' service standards prescribe defined timelines for processing new connection applications — from field inspection and estimate preparation to energisation. RTI can provide:

  • Stage-wise processing status of your application — the date each stage was completed (or the reason it remains pending), including field inspection, estimate preparation, demand notice issuance, payment confirmation, material issuance, erection work, and meter installation
  • The name and designation of the officer currently responsible for the pending stage
  • Whether any official reason has been recorded for a delay beyond the TSERC-prescribed or DISCOM service standard timeline

Agricultural Pump Connections

Agricultural pump connections (LT Category IV under TSERC tariff orders) are among the most frequently delayed connection categories in Telangana. In addition to the stage-wise status of your application, RTI can provide:

  • The number of LT agricultural pump connection applications pending at your section or division as of a specified date
  • The approved release schedule for your feeder or section and whether your application falls within a currently approved release plan
  • The name of the engineer responsible for approvals at the section and division level

Transformer Load and Maintenance Records

Both DISCOMs maintain records for every distribution transformer in their network as part of their regulatory reporting obligations to TSERC. RTI can provide:

  • The rated capacity (KVA) and actual load (as a percentage of rated capacity) of the transformer serving your premises
  • The date and cause of each transformer breakdown or failure during a specified financial year, the time taken to restore supply, and the number of consumers affected
  • Whether the repair or replacement was carried out by DISCOM staff or under an external maintenance contract — and if under contract, the contractor's name and the work order reference number

Transformer overloading is a common cause of frequent power outages and voltage fluctuations in Telangana. RTI data demonstrating persistent overloading despite formal complaints is useful evidence for an escalation to the Superintending Engineer, the CGRF, or TSERC.

Meter Testing Records

Under the Indian Electricity Rules and TSERC regulations, a consumer may request meter accuracy testing. RTI can provide:

  • The date and location of the test, the methodology applied, the testing officer's name and designation, and the percentage error recorded
  • Whether the meter was certified as accurate or declared defective, and the date on which it was replaced if defective
  • Any adjusted bills issued to correct overbilling caused by a defective meter, and the basis for the adjustment calculation

Consumer Complaint Records

Both DISCOMs maintain complaint registers at the section, sub-division, division, circle, and corporate levels. RTI can disclose:

  • The total number of complaints received during a specified financial year at a specified section or division, categorised by type — billing disputes, meter faults, new connection delays, transformer failures, agricultural pump connections, voltage fluctuations, and other categories
  • The number of complaints resolved within the TSERC-notified consumer service standards and the number pending beyond that period
  • The average time taken to resolve each category, which reveals systemic service failures

Where to File: Division, Circle, or MD Office

TSSPDCL and TSNPDCL operate on a decentralised administrative structure. The correct office for filing an RTI application depends on the subject matter:

  • For consumer-level matters — billing disputes, meter complaints, individual new connection applications, local transformer data, and section-level complaint records — file with the SPIO at the concerned Divisional Engineer (DE) or Assistant Divisional Engineer (ADE) office that administers your consumer number. Your electricity bill shows the section and division details.
  • For feeder-level or circle-level data — for example, the load profile of a specific feeder, circle-level capital works, or circle-level complaint summary — file with the SPIO at the office of the Superintending Engineer (SE) of the concerned Circle.
  • For corporate policy, budgets, and senior-level administrative records — file with the SPIO at the Managing Director's office (TSSPDCL: Mint Compound, Hyderabad; TSNPDCL: Vidyut Bhavan, Warangal).

If you are uncertain about the correct SPIO, file at the Division level — section 6(3) of the RTI Act requires the SPIO to transfer the application to the correct authority within five days if it was misdirected.

How to File Your RTI Application

Online Filing

Both TSSPDCL and TSNPDCL, being Telangana State public authorities, are covered by the state's centralised RTI portal at rti.telangana.gov.in. The portal allows you to:

  • File an RTI application against TSSPDCL or TSNPDCL directly
  • Pay the ₹10 application fee online by net banking, UPI, or debit/credit card
  • Track the application status and receive the SPIO's reply electronically
  • File a First Appeal online if the reply is unsatisfactory

Register on the portal, select the relevant DISCOM as the public authority, complete the application form, attach any supporting documents (such as your electricity bill, previous complaint acknowledgement, or connection application receipt), and pay the fee online.

Physical Filing

You may also file a physical application by:

  1. Addressing it to the SPIO at the concerned Division or Circle Office (see address on your electricity bill or on the DISCOM's website)
  2. Attaching the ₹10 fee via Indian Postal Order (IPO) drawn in favour of "The Accounts Officer, TSSPDCL" or "The Accounts Officer, TSNPDCL" (as applicable), or a demand draft in the same name — confirm the preferred instrument with the local office before dispatch
  3. Sending by registered post with acknowledgement due, or delivering in person against a dated receipt

BPL cardholders are exempt from the ₹10 fee under the RTI (Regulation of Fee and Cost) Rules, 2005. Attach a copy of your BPL ration card with your application.

Keep your acknowledgement slip, postal tracking receipt, or online application number. These are essential if you need to escalate to an appeal.

What to Include in Your Application

  • Your full name, address, phone number, and email address
  • Your consumer number and meter number (for billing or meter-related queries)
  • Your service connection application reference number (for new connection queries)
  • The feeder or section name (for transformer or outage data)
  • Each information request as a separate, numbered item — be specific about dates, financial years, and document types
  • A statement: "I am seeking this information under Section 6 of the RTI Act, 2005"

Avoid vague requests such as "provide all records related to my account." The more precisely you frame each query, the more likely you are to receive a complete response within the 30-day period.

Timelines and Appeals

Response Deadline

The SPIO must provide a response within 30 days of receipt of your application under Section 7(1) of the RTI Act, 2005. If the information sought relates to a matter involving the life or liberty of a person, the SPIO must respond within 48 hours under the Section 7(1) proviso.

First Appeal (Section 19(1))

If the SPIO does not respond within 30 days, or the response is incomplete, evasive, or unsatisfactory, file a First Appeal under Section 19(1) of the RTI Act with the First Appellate Authority (FAA) designated within TSSPDCL or TSNPDCL — typically the Superintending Engineer at the Circle level or a senior officer designated for this purpose. The First Appeal must be filed within 30 days of the date of the decision or expiry of the 30-day response period, whichever is applicable. No fee is required. Attach your original application, fee receipt, and the SPIO's reply (if any). The FAA must dispose of the First Appeal within 30 days (extendable to 45 days).

Second Appeal (Section 19(3))

If the FAA also fails to respond or gives an unsatisfactory reply, file a Second Appeal under Section 19(3) with the Telangana State Information Commission (TSIC) within 90 days of the FAA's decision or the expiry of the FAA's response period. TSIC is the State Information Commission constituted under Section 15 of the RTI Act for all Telangana state public authorities. The Central Information Commission (CIC) has no jurisdiction over TSSPDCL or TSNPDCL — both are state public authorities, and filing a second appeal with the CIC will result in it being returned as not maintainable.

TSIC can direct the DISCOM to furnish the information, impose a penalty of ₹250 per day (up to ₹25,000) on the SPIO personally under Section 20 of the RTI Act, and recommend disciplinary action if the default was without reasonable cause.

Parallel Remedies Alongside RTI

RTI and regulatory/consumer remedies work best when used together. Filing an RTI first gives you the documented records needed to support complaints through these parallel channels:

Consumer Grievances Redressal Forum (CGRF)

Both TSSPDCL and TSNPDCL have CGRFs constituted under Section 42(5) of the Electricity Act, 2003, and TSERC regulations. The CGRF adjudicates complaints about billing disputes, service quality, and delayed connections — typically within 60 days. An RTI response containing certified copies of meter reading registers and billing worksheets significantly strengthens a CGRF complaint.

TSERC Ombudsman

If the CGRF's decision is unsatisfactory, the consumer may appeal to the Electricity Ombudsman appointed by TSERC under Section 42(6) of the Electricity Act, 2003. The Ombudsman can review CGRF decisions and provide an independent adjudication.

TSERC (Telangana State Electricity Regulatory Commission)

TSERC is the independent statutory regulator for the Telangana electricity sector. It is a separate public authority from TSSPDCL and TSNPDCL and is not the correct target for consumer-level billing or connection RTI applications. However, TSERC sets tariff orders, supply codes, and service standards — and if RTI data shows systemic non-compliance by either DISCOM with TSERC-notified standards (for example, response times for new connections or transformer restoration), that data can be cited in a formal representation to TSERC.

Consumer Forum (District Consumer Disputes Redressal Commission)

If the DISCOM's deficiency of service has caused quantifiable monetary loss — for example, sustained overbilling confirmed by meter testing, or compensation for prolonged power outages — you may file a consumer complaint before the District Consumer Disputes Redressal Commission under the Consumer Protection Act, 2019. The RTI response and CGRF order (if any) serve as key documentary evidence in such proceedings.

Tips for an Effective RTI Application

  • Always include your consumer number and meter number when seeking billing or meter-related information. Without these identifiers, the SPIO may return your application as unanswerable.
  • Specify exact billing cycles or financial years. Requests without a defined time window are difficult to process and may be returned as "information not available in the requested form."
  • Ask for certified copies of specific records — meter reading registers, tariff calculation worksheets, transformer maintenance logs, complaint registers — rather than asking the DISCOM to "explain" a decision. Certified copies are admissible as evidence before the CGRF, TSERC, or a civil court.
  • For billing disputes, file the RTI before the CGRF complaint. The RTI response will contain the actual meter reading data and billing calculation; this documented evidence will significantly strengthen your position before the Consumer Grievances Redressal Forum.
  • For agricultural pump connections, also ask for the approved release schedule and the number of pending applications ahead of yours — this data often reveals whether your application is being processed in order or has been skipped, which is important information for a formal complaint.
  • Cross-reference transformer load data with outage frequency. If RTI reveals that a transformer serving your area has been operating above rated capacity for an extended period, that data is direct evidence of a preventable service failure that can be cited in a CGRF or TSERC complaint.

Sample RTI Application Draft

To, The State Public Information Officer (SPIO), Office of the Divisional Engineer / Assistant Divisional Engineer, TSSPDCL / TSNPDCL, [Division Name], [Full Address of the Division Office] Subject: Application under the Right to Information Act, 2005 — Meter Reading History, Billing Records, New Connection Status, and Transformer Load Data Sir/Madam, I, [Your Full Name], residing at [Your Full Address], submit this application under Section 6 of the Right to Information Act, 2005, and seek the following information: Consumer/applicant details (fill as applicable): Consumer Number: [Your Consumer Number as on electricity bill] Meter Number: [Your Meter Number] Service Connection Application Reference Number: [Ref. No., if applicable] Section / Sub-Division / Division Name: [as appearing on your bill] Information sought: 1. Complete meter reading records for my consumer number [XXXXXXXXXX] for each billing cycle from [Month/Year] to [Month/Year] (last 12 months) — including the opening and closing meter readings recorded by the meter reader, the units consumed as per the meter, the applicable tariff category and rate per unit, all fixed charges, fuel surcharge adjustment, and other charges included in each bill, and whether estimated or average billing was applied during this period in lieu of an actual meter reading, and if so, the reason and the billing cycles for which estimated billing was used. 2. The current status of my new service connection application bearing reference number [XXXXXXXXXX] submitted on [DD/MM/YYYY] — including the date on which each processing stage was completed (application receipt, field inspection, estimate preparation, demand notice issued, payment receipt confirmed, material issued, erection completed, and meter installed), the name and designation of the officer responsible for each pending stage, and the reason for any delay beyond the prescribed service standard timeline. 3. Transformer load data and maintenance records for the distribution transformer serving my premises (transformer identification number / feeder name: [as applicable]) — including the rated and actual load as of [Month/Year], the date and details of all breakdowns or failures during FY 2024-25, the cause of each failure, the time taken for restoration, and whether the repair was carried out by TSSPDCL / TSNPDCL staff or under a maintenance contract (if under contract, the name of the contractor and work order reference). 4. The result of the meter accuracy test conducted on my meter bearing meter number [XXXXXXXXXX] on or around [DD/MM/YYYY] — including the date and location of the test, the name and designation of the testing officer, the testing methodology applied, the percentage error recorded, whether the meter was certified as accurate or declared defective, and if declared defective, the date on which it was replaced and any adjusted bills issued to correct overbilling caused by the defective meter. 5. Total number and category-wise details of consumer complaints received at [Section / Sub-Division / Division Name] during FY 2024-25 — including complaints about billing disputes, delayed new connections, meter faults, transformer failures, agricultural pump connections, and voltage fluctuations; the number resolved within the prescribed service standard period; the number pending beyond that period as of [DD/MM/YYYY]; and the average time taken to resolve each category. I am enclosing the application fee of ₹10 [via demand draft / Indian Postal Order / cash receipt / online payment reference no.: ________]. I request the above information within 30 days as required under Section 7(1) of the RTI Act, 2005. Yours sincerely, [Your Full Name] [Your Complete Address] Phone: [Your 10-digit Mobile Number] Email: [[email protected]] Date: [DD/MM/YYYY]

Replace all text in [square brackets] with your actual details before filing. Do not include the brackets in your submission.

Frequently Asked Questions

Rather have us file it for you?

We research your case, identify the right department, draft the RTI with proven language, and file it on your behalf. Pay ₹149 + GST only after we've done the work.

File RTI — it's free to start
RTI SathiRTI Sathi
Making Right to Information accessible for every Indian citizen.

Disclaimer: RTI Sathi (rtisathi.com) is an independent, privately owned and operated service. We are not affiliated with, authorised by, or acting on behalf of the Government of India, any State Government, or any government ministry or department. We are not the official RTI portal. The official government portal for filing Central Government RTI applications is rtionline.gov.in.

© 2026 RTI Sathi · India
Direct Government Filing Service

Proudly made and operated with from Delhi, India