Step-by-step guide to file an RTI with Central Government Public Sector Undertakings (PSUs) such as BHEL, NTPC, ONGC, SAIL, HAL, Power Grid, and GAIL for employee service matters (promotion, transfer, disciplinary proceedings, APAR), tender/contract information, and CSR spending. All Central Govt PSUs are public authorities under RTI Section 2(h). Second appeal: CIC.

Updated 24 May 2026
Quick Facts
MinistryMinistry of Heavy Industries / Ministry of Power / Ministry of Petroleum and Natural Gas / Ministry of Steel (varies by PSU)
Address RTI ToCPIO at the Corporate Office or relevant Regional/Plant Office of the specific PSU
Application Fee₹10 under RTI (Regulation of Fee and Cost) Rules, 2005. Free for BPL cardholders.
Response Time30 days from receipt (Section 7(1), RTI Act 2005). 48 hours if the matter involves life or liberty.
All information on this page is based on the Right to Information Act, 2005 (Act No. 22 of 2005) and the RTI (Regulation of Fee and Cost) Rules, 2005. First Appeal: Section 19(1). Second Appeal to CIC/SIC: Section 19(3).

Central Government Public Sector Undertakings (PSUs) — including Navratna and Maharatna companies such as BHEL, NTPC, ONGC, SAIL, HAL, Power Grid Corporation, and GAIL — are public authorities under Section 2(h) of the Right to Information Act, 2005. Because they are substantially financed by, or under the control of, the Central Government, they are fully subject to RTI obligations and must appoint CPIOs and respond to RTI applications within 30 days.

The RTI Act does not carve out any exception for employment relationships: a PSU employee can file an RTI against their own employer for service matters in exactly the same way as an outside citizen. This guide covers how to use RTI to address promotion disputes, transfer policy compliance, disciplinary proceedings, APAR entries, tender transparency, and CSR accountability in Central Government PSUs.

Key Central Government PSUs Covered

The guide covers PSUs under Central Government ministries. Note that state government PSUs (e.g., MSEDCL, KSRTC, TANGEDCO) are administered by state governments and their second appeal lies with the relevant State Information Commission, not the CIC.

PSUMinistrySectorHow to Identify CPIO
BHEL (Bharat Heavy Electricals Limited)Ministry of Heavy IndustriesPower equipment manufacturingCorporate Office: BHEL House, New Delhi; Plant offices at Haridwar, Bhopal, Trichy, Hyderabad, etc.
NTPC LimitedMinistry of PowerPower generationCorporate Office: SCOPE Complex, New Delhi; Project/Station offices at each power plant
ONGC (Oil and Natural Gas Corporation)Ministry of Petroleum and Natural GasPetroleum explorationCorporate Office: New Delhi; Asset/Basin offices at Mumbai, Dehradun, Nazira, Vadodara, etc.
SAIL (Steel Authority of India Limited)Ministry of SteelSteel productionCorporate Office: New Delhi; Plant offices at Bhilai, Bokaro, Rourkela, Durgapur, Burnpur
HAL (Hindustan Aeronautics Limited)Ministry of DefenceDefence aerospaceCorporate Office: Bengaluru; Division offices at Bengaluru, Nashik, Koraput, Hyderabad, etc.
Power Grid Corporation of IndiaMinistry of PowerPower transmissionCorporate Office: Gurugram; Regional Transmission System (RTS) offices across India
GAIL (India) LimitedMinistry of Petroleum and Natural GasNatural gas transmissionCorporate Office: New Delhi; Regional offices and Pipeline stations
BPCL / HPCL / IOCLMinistry of Petroleum and Natural GasPetroleum refining and retailCorporate Offices: Mumbai (BPCL, HPCL), New Delhi (IOCL); Regional offices and refineries
NLCIL (NLC India Limited)Ministry of CoalLignite mining and powerCorporate Office: Neyveli, Tamil Nadu; Rajasthan Project Office

Employee Service Matters: What RTI Can Establish

IssueWhat to AskRealistic Expectation
Promotion bypassedSeniority list position; DPC proceedings and vacancy count; eligibility criteria applied; specific reason for non-recommendationGet the DPC's own recorded basis for not selecting you; confirm whether a vacancy existed; verify the criteria were uniformly applied
TransferApplicable rotation transfer policy for your grade; whether your specific transfer was within normal tenure; whether your hardship representation was consideredConfirm if transfer deviated from the stated rotation policy; establish a paper trail before approaching the FAA or a court
Disciplinary proceedingsCopy of charge sheet (if not received); Enquiry Officer's report after enquiry is concluded; Disciplinary Authority's reasoned orderGet the full evidentiary basis of the penalty imposed; identify procedural lapses (e.g., EO's report not supplied before DA's order)
APAR / ACROwn APAR entries — overall grading, communication of entry to employee, outcome of any representationVerify the grade awarded and whether the required communication procedure was followed; a withheld or uncommunicated APAR can be grounds to challenge the grading
Seniority disputeCurrent seniority list for your cadre; inter se seniority position of employees promoted togetherEstablish exact seniority position relative to colleagues; identify whether a more senior employee was overlooked in a promotion exercise

Contracts and CSR: What RTI Can Establish

Tender and contract transparency: PSU contracts above threshold values are governed by internal procurement manuals and General Financial Rules (GFR). RTI can expose: the tender evaluation criteria, the winning bid and awarded value, whether the contract went to the lowest technically compliant bidder, deviations from procurement rules, and the current execution status of a project. This is relevant both for contractors who lost bids and for citizens who want to ensure that PSU infrastructure projects are awarded and executed without irregularity.

CSR accountability: PSUs with net worth above ₹500 crore, turnover above ₹1,000 crore, or net profit above ₹5 crore in any of the preceding three financial years must spend at least 2% of the average net profit on CSR activities under Section 135 of the Companies Act, 2013. The DPE (Department of Public Enterprises) also issues separate CSR guidelines for Central Govt PSUs. For communities near PSU plants and projects, RTI can establish: total CSR obligation vs. actual spend; project-wise allocation in a specific district; implementing agencies and amounts released; and whether unspent CSR funds were properly transferred to the Unspent CSR Account.

Where to File

All Central Government PSUs are accessible on rtionline.gov.in:

  1. Select the relevant Central Government Ministry (e.g., Ministry of Heavy Industries for BHEL, Ministry of Power for NTPC)
  2. Select the PSU from the list of public authorities under that ministry (Corporate Office or the specific plant/regional office, depending on where records are held)
  3. Draft your application with employee ID, grade, plant/unit name, and the specific service matter or contract reference
  4. Pay ₹10 online. BPL cardholders are exempt
  5. Submit and note your registration number

Some PSUs also have their own RTI portals on their official websites (e.g., ONGC's website has an RTI section, as does NTPC's). However, rtionline.gov.in is the primary government platform and is generally preferable as it provides a trackable registration number and integrates with the national RTI system.

Corporate Office vs. Plant/Regional Office: For matters that arose at a specific plant or project site — your promotion at a particular plant, a transfer order issued by a plant-level authority, or a contract awarded by a project office — direct the RTI to the plant or regional office. For company-wide policy documents (overall transfer policy, grade-wise promotion criteria, company-level CSR report) — direct to the Corporate Office CPIO. If uncertain, file with the Corporate Office and request a transfer under Section 6(3) of the RTI Act to the appropriate office.

What Specific Information Can You Ask For

Promotion and seniority:

  1. Seniority list as on date for the grade/cadre of Grade at Plant/Unit — names, employee IDs, and seniority positions
  2. DPC proceedings for promotion to Grade held in year — number of vacancies, eligibility criteria, zone of consideration, and basis of non-recommendation for Employee ID XXX
  3. Whether a vacancy existed in the higher grade on the date the DPC was convened, and the sanctioned strength vs. actual strength at that time

Transfer: 4. The rotation transfer policy and normal tenure for Grade XXX at Plant/Unit 5. Whether transfer order dated DD/MM/YYYY for Employee ID XXX was in accordance with the rotation policy 6. Whether hardship representation submitted by Employee ID XXX on DD/MM/YYYY was placed before the competent authority — decision and reasons

Disciplinary proceedings: 7. Copy of charge sheet / articles of charge for Employee ID XXX 8. Copy of Enquiry Officer's report for the enquiry conducted against Employee ID XXX (request after enquiry is concluded) 9. Disciplinary Authority's order — penalty imposed and the specific service rule provision cited

APAR / ACR: 10. APAR entries for Employee ID XXX for assessment years YYYY-YY and YYYY-YY — overall grading and whether entry was communicated to the employee 11. Outcome of any representation filed by Employee ID XXX against the APAR entry for YYYY-YY — whether the entry was revised

Tender / contract: 12. Tender details for Project Name at Plant/Unit — tender reference, estimated value, number of bids, contractor selected, awarded value, and selection basis 13. Current execution status of contract for Project Name — whether on schedule, and if delayed, the reason

CSR spending: 14. Total CSR obligation and actual expenditure for PSU Name for FY YYYY-YY 15. List of CSR projects in District/State for FY YYYY-YY — project name, implementing agency, amount sanctioned, amount released, completion status

Appeals

First Appeal (Section 19(1)): File with the First Appellate Authority (FAA) at the PSU — typically the General Manager (HR) or a Director-level officer at the corporate or plant level — within 30 days of the date of decision or expiry of the 30-day response period, whichever is applicable. The contact details for the FAA are usually listed on the PSU's website alongside the CPIO details.

Second Appeal (Section 19(3)): File with the Central Information Commission (CIC) within 90 days of the FAA's decision or non-response. All Central Government PSUs — BHEL, NTPC, ONGC, SAIL, HAL, Power Grid, GAIL, BPCL, HPCL, IOCL, and others under Central Government ministries — are Central Government public authorities. The second appeal always goes to the CIC, not to any State Information Commission. State SICs handle state government bodies and state PSUs only.

Sample RTI Application Draft

To, The Central Public Information Officer (CPIO), [PSU Name — e.g., Bharat Heavy Electricals Limited (BHEL)] [Corporate Office / Plant Office / Regional Office Name and Address e.g., BHEL House, Siri Fort, New Delhi – 110049 OR: BHEL, Heavy Electrical Equipment Plant, Haridwar – 249403] Subject: Application under the Right to Information Act, 2005 — [Employee Service Matter / Promotion / Transfer / Disciplinary Proceedings / APAR / Tender / CSR Spending] Sir/Madam, I, [Your Full Name], residing at [Your Complete Address], submit this application under Section 6 of the Right to Information Act, 2005, to seek the following information: Employee / Reference details (fill as applicable): PSU Name and Plant/Unit: [e.g., BHEL, Heavy Electrical Equipment Plant, Haridwar] Employee Name: [Full Name] Employee ID / Personnel Number: [XXX] Designation / Grade: [e.g., Engineer-II, E2 Grade] Department / Section: [e.g., Manufacturing — Turbine Shop] Information sought: 1. The seniority list as on [DD/MM/YYYY] for the grade/cadre of [e.g., Engineer-II / E2] at [Plant/Unit Name] — showing the names and employee IDs of all employees in the cadre, their date of joining the grade, and their position in the seniority list. 2. The Departmental Promotion Committee (DPC) proceedings for the promotion exercise held in [year/quarter] for promotion to [Grade, e.g., Engineer-I / E3] at [Plant/Unit]: (a) Whether a vacancy existed in the higher grade at the time the DPC was convened — number of vacancies considered; (b) The eligibility criteria applied (years in grade, APAR rating threshold, vigilance clearance requirement); (c) The names and employee IDs of employees considered by the DPC; (d) The basis on which the above employee (Employee ID [XXX]) was not recommended — specific reason recorded by the DPC. 3. The transfer policy applicable to the grade/cadre of Employee ID [XXX] — specifically: (a) The rotation transfer policy for this grade, including the normal tenure at a station; (b) Whether Employee ID [XXX]'s transfer order dated [DD/MM/YYYY] was in accordance with the rotation policy and the applicable transfer guidelines; (c) Whether a hardship representation submitted by Employee ID [XXX] on [DD/MM/YYYY] was considered by the competent authority — and if so, the decision and reasons. 4. [If a disciplinary enquiry is involved] In the disciplinary proceedings against Employee ID [XXX]: (a) A copy of the charge sheet / articles of charge issued to the employee; (b) A copy of the Enquiry Officer's report (after the enquiry has been concluded); (c) The decision of the Disciplinary Authority — the penalty imposed and the specific provisions of the service rules under which it was imposed. 5. The Annual Performance Appraisal Report (APAR / ACR) entries for Employee ID [XXX] for the assessment years [YYYY-YY] and [YYYY-YY] — specifically: (a) The overall grading / numerical score awarded in each year; (b) Whether the employee was communicated the APAR entry and given an opportunity to make a representation; (c) Whether any representation by the employee was accepted and if the entry was revised. 6. [For tender/contract matters] Details of the tender / contract awarded for [Project Name / Description], [Plant/Unit]: (a) Tender reference number, date of notice inviting tender, and estimated contract value; (b) Number of bids received and names of bidders; (c) Name of the successful contractor / vendor and the awarded contract value; (d) The evaluation criteria applied and the basis for selection of the successful bidder; (e) Current project execution status — whether the contract is on schedule, and if delayed, the reasons. 7. [For CSR matters] CSR (Corporate Social Responsibility) spending by [PSU Name] for the financial year(s) [YYYY-YY]: (a) Total CSR budget allocated and total amount actually spent during the year; (b) List of all CSR projects undertaken in [District/State] — project name, implementing agency, amount sanctioned, amount released, and completion status; (c) Whether any CSR amount remained unspent and was transferred to the Unspent CSR Account under the Companies Act, 2013. I am enclosing the application fee of Rs. 10 [via online payment; Reference No.: [Payment Ref]]. I request the above information within 30 days as required under Section 7(1) of the RTI Act, 2005. Yours sincerely, [Your Full Name] [Your Complete Address] Phone: [Your 10-digit Mobile Number] Email: [[email protected]] Date: [DD/MM/YYYY]

Replace all text in [square brackets] with your actual details before filing. Do not include the brackets in your submission.

Frequently Asked Questions

Rather have us file it for you?

We research your case, identify the right department, draft the RTI with proven language, and file it on your behalf. Pay ₹149 + GST only after we've done the work.

File RTI — it's free to start
RTI SathiRTI Sathi
Making Right to Information accessible for every Indian citizen.

Disclaimer: RTI Sathi (rtisathi.com) is an independent, privately owned and operated service. We are not affiliated with, authorised by, or acting on behalf of the Government of India, any State Government, or any government ministry or department. We are not the official RTI portal. The official government portal for filing Central Government RTI applications is rtionline.gov.in.

© 2026 RTI Sathi · India
Direct Government Filing Service

Proudly made and operated with from Delhi, India